Skip to main content

Hot line: +(99872) 226 68 10

3+1 joint education program

Welcome to the joint educational program with the Belarusian State Pedagogical University!

The Constitution is our basic law!

December 8 — Constitution Day Of The Republic of Uzbekistan

An ode reflecting a high sense of patriotism!

December 10 — the day of the adoption of the state anthem of the Republic of Uzbekistan

New year is an opportunity for new goals!

Happy New Year 2024!

Memory is holy - dear to man!

May 9 - day of memory and appreciation

JSPU 50 years old!

Happy 50th birthday of Jizzakh State Pedagogical University!

Financial economy

Dzhizzakh State Pedagogical Institute named after A.Kadiriy about the work carried out within the framework of the financial-economic system A LUMO TJizzakh Dalvat Pedagogical Institute is located in Jizzakh city, Sharof Rashidov str., 4, total area is 101766 m2 . Of these, 6300 m2 of land, 21943 m2 of garden and flower beds are 73523 sq. M. The territory of the Institute is completely enclosed with steel lattices. There are 8 buildings of Instyut, 4 of which are educational buildings, 1 sports complex, 1 student residence, 1 children’s camping and summer swimming pool. There are 445 rooms in these existing buildings, with 197 lexies, 16 labs, 66 administrative rooms and 19 rooms for 147 students. At the same time, the institute has modern (typewriter) sports fields including running, football, valleyball, basketball, handball, weightlifting and weightlifting, creating all the conditions for sportsmen A number of practical works have been carried out to implement the decrees and resolutions of the President of the Republic of Uzbekistan on measures for the development of children’s sports in the activities of the institute. In particular, all existing sports grounds are fully repaired and equipped with additional sports equipment. For the rational use of resources and the economy of the funds, the funds of the sponsors have been attracted, and the sports camp a sports ground has been built and all the conditions have been created to engage in sports. These expenses were attracted by more than 150 million sums. The decree of the President of the Republic of Uzbekistan from January 27, 2010 № PP-1271 and Cabinet of Ministers of the Republic of Uzbekistan from August 20, 2010 ” On Measures to Improve Measures for Improvement of Living Standards “and for the purpose of economy of budgetary funds entrepreneurs were attracted, and at the expense of entrepreneurs at the institute were established food and drinking stations at the level of full sanitary and hygienic requirements , quality service for professors, teachers, workers and students operating in the institute is under constant supervision by the administration of the institute. In addition, working on the basis of non-budgetary business, a layer for the development of service and service or things are done. Including attracting entrepreneurs on the territory of the institute bookstore, photography and household service points are organized at the level of architectural requirements. At the same time short-term training courses are being organized for effective use of scientific potential of the faculty and additional material and spiritual support of the institute. The Cabinet of Ministers of the Republic of Uzbekistan In pursuance of the Order No. 154-f of March 5, the Ministry of Education and Science of the Republic of Uzbekistan No. 101 of March 9, 2012 “On the organization of Months of beautification and landscaping in educational institutions and organization of national charity” “On the basis of the speech of the President of the Republic of Uzbekistan Islam Karimov on March 16, 2012, the city council of people’s deputies of the city of Tashkent, on the basis of the renovation, landscaping, with the aim of implementing the orders of the President of the Republic of Uzbekistan № 142 In order to carry out wide-scale work on beautification, landscaping and cleaning of the territory, internal control and measures of the Institute were developed and implemented, and a number of activities were implemented. All types of fruits and ornamental trees in the area were justified and equated to the same size. Cleaning works have been carried out in the area and wastes have been dumped into special waste disposal sites. As for the communication lines, the sewerage network is connected to central heating and gas boilers with natural gas are installed. In general, for the last three years to ensure the proper use of budgetary funds for the purpose of preventing overheads and saving budgetary resources, utilities have the potential to increase electricity, gas and water, over 440 million in the last 2010-2011-2012, with a focus on rational utilization of